- Applying and getting load sanction from Electricity boards.
- Making drawings of Electrical layout & distribution system as per IE rules and getting approval from Electrical Inspector Department.
- Getting load released including complying all the formalities required to be done with Electrical Inspector and Electricity boards.
Supply, Erection, Testing & commissioning Jobs :
- Supply, erection & commissioning of total Electrical works for high voltage and low voltage installations.
- We carry out complete Electrical testing of installation which includes I.R. test, earthing test, Transformer test, CT & PT test, Relay test, etc.
- Design, Supply, Installation, Testing & Commissioning of HT/LT Panels, Cables tray work, all types of cabling work.
- Design, Supply, Installation, Testing & Commissioning of APFC Panels.
- HT/LT Cables laying, terminations, testing.
- Transformers, DG Sets, Complete low side electrical works, earthing etc.
- Annual Maintenance Contracts for routine and preventive maintenance of electrical Installation, Operation & Maintenance of all Electrical HT/LT Panels, Switchgear etc. on 365 days, 24 x 7 bases.
- Operation & Maintenance of all Electrical Installations in accordance with Manufacture’s specifications,
- Instruction Manuals, IE Rules and other rules as specified by Company.
- Testing & calibration with test certificates of all CTs, PTs, relays, meters, etc.
- Erection, Testing and commissioning of HT/LT line and Bay.
Team Experience and Strength :
- A competent result oriented professional with more than 12 years’ experience in project erection, commissioning, operation and maintenance of Power Generation plant including EHV, HV and LV transmission line and Substation erection/Commissioning.
- We have a skilled team of 12 employees for HV and LV line and Bay erection work.
- We have a skilled team of 8 employees for Substation erection work.
- We have 13 employees for cable tray, cable laying, cable termination, PCC/MCC panel erection work including welder/fitter.
Quality Assurance :
We have a simple philosophy of getting the job done on time and budget, while still providing quality of services.
Our Projects :
1.MSEDCL work of electrification to DLF (Dedicated Distribution Facility) & AGP consumers under DPDC (District Planning & Development Committee), Special Component Plan (SCP), Tribal sub plan (TSP), other tribal sub plan (OTSP) under Bhandara Division.
2. MSEDCL work Turnkey contract for commission of LT line shifting in r/o Executive Engineer, Minor irrigation, Gosikhurd Ambadi (Bhandara) At – Mangali under Lakhani subdivision under 100% Outright Contribution Scheme (ORC) DDF of Sakoli Division.
3. MSEDCL work Replacement /shifting of existing single phase energy meter by new IR single phase Electromechanical meter are provided by S/D office under Bhandara Division.
4. MSEDCL work of electrification to AGP- Special Component Plan (SCP) consumers under S/D Mohadi , Bhandara Division.
5. MSEDCL work of electrification to release new IR single phase Residential connections under Saubhagya Yojana Scheme under S/D Bhandara Division.
6. MSEDCL work of electrification of Feeders, Villages / Habitations of Chandrapur District at Maharashtra under Deen Dayal Upadhyay Gram Jyoti Yojana (DDUGJY) Scheme.
7. PWD work Providing Replacement of Submersible Pump & Street Light Arrangement at Judges Qtrs. Tumsar Tah. Tumsar Distt. Bhandara.
8. PWD work Providing Renovation to EI at Executive Engineer Chamber P.W Division Bhandara.
9. PWD work Providing E.I.to Lift Machine Room at Medical Complex General Hospital Bhandara Distt. Bhandara.
10.ZP Bhandara work Erecting & Commissioning of Solar High Mast Pole of 12.5 at Pindakepar Ta. & Dist. Bhandara.
11. ZP Bhandara work Electrical installation to Mahila Bachalgat selling centre at Bladegaon Mohadi Ta. & Dist. Bhandara.
12. ZP Bhandara work Erecting & Commissioning of Solar High Mast Pole of 12.5 at Sawori Ta. & Dist. Bhandara.
13. Residential & Commercial electrification work.